Description
مشروع فرن النفق المتنقل
The second 17.3 m mobile tunnel kiln line in Uzbekistan, documented through a dedicated on-site project image set.
Project overview
This project record documents Line 2 of a 17.3 m mobile tunnel kiln installation in Uzbekistan. The gallery shows the automated brick-setting equipment, circular handling route and kiln workshop arrangement.
Engineering scope
Need a kiln configuration for your site?
Share your raw material, target capacity, fuel type and available site information with our engineering team.
















