Uzbekistan 17.3 m Mobile Tunnel Kiln Project — Line 2

Uzbekistan 17.3 m Mobile Tunnel Kiln Project — Line 2 Overview

The second 17.3 m mobile tunnel kiln line in Uzbekistan, documented through a dedicated on-site project image set.

Yaxin menghadirkan solusi kiln yang disesuaikan yang didukung oleh dukungan turnkey dan pengalaman proyek di luar negeri.

Product Catalog & Technical Information

Download our catalog for kiln configurations, supporting equipment and project-planning reference.

Description

PROJECT OVERVIEW · UZBEKISTAN

Proyek Kiln Terowongan Seluler

The second 17.3 m mobile tunnel kiln line in Uzbekistan, documented through a dedicated on-site project image set.

17.3 mKiln width
Line 2Production line
UzbekistanProject market

Project overview

This project record documents Line 2 of a 17.3 m mobile tunnel kiln installation in Uzbekistan. The gallery shows the automated brick-setting equipment, circular handling route and kiln workshop arrangement.

Engineering scope

Production routeContinuous mobile-kiln firing
AutomationAutomated brick setting and organized conveying
Project recordDedicated Line 2 on-site image set
SupportEngineering guidance, installation and commissioning coordination
PLAN A SIMILAR PROJECT

Need a kiln configuration for your site?

Share your raw material, target capacity, fuel type and available site information with our engineering team.

Contact Our Engineers

Ready To Launch Your Brick Making Project?

Share your raw materials, target capacity and site conditions. Our engineering team will recommend a suitable kiln configuration and implementation plan.

Contact Info:

官网询盘

View More Product Cases

Jejak Proyek Global Kami

官网询盘