Hunan Changde 4.6 m Triple-Section Tunnel Kiln Project

Hunan Changde 4.6 m Triple-Section Tunnel Kiln Project Overview

A 4.6 m triple-section tunnel kiln project in Changde, Hunan, documented by the original case page and local project gallery.

Yaxin предлагает индивидуальные решения для печей, подкрепленные поддержкой "под ключ" и опытом зарубежных проектов.

Product Catalog & Technical Information

Download our catalog for kiln configurations, supporting equipment and project-planning reference.

Description

PROJECT OVERVIEW · CHINA

Triple-Section Large-Cross-Section Tunnel Kiln Project

A 4.6 m triple-section tunnel kiln project in Changde, Hunan, documented by the original case page and local project gallery.

4.6 mSection width
Triple-sectionKiln configuration
ChangdeProject location

Project overview

This Changde project combines three parallel tunnel-kiln sections in one production arrangement. The project gallery records the kiln-car lanes, brick stacks and supporting workshop environment.

Engineering scope

Production routeThree parallel tunnel-kiln sections
Site integrationKiln-car lanes and covered workshop
Project recordOperating-area and exterior project views
SupportEngineering guidance, installation and commissioning coordination
PLAN A SIMILAR PROJECT

Need a kiln configuration for your site?

Share your raw material, target capacity, fuel type and available site information with our engineering team.

Contact Our Engineers

Ready To Launch Your Brick Making Project?

Share your raw materials, target capacity and site conditions. Our engineering team will recommend a suitable kiln configuration and implementation plan.

Contact Info:

官网询盘

View More Product Cases

Наш глобальный проект

官网询盘