Xinjiang Aksu 12.98 m Mobile Tunnel Kiln Project

Xinjiang Aksu 12.98 m Mobile Tunnel Kiln Project Overview

A 12.98 m mobile tunnel kiln project in Xinjiang, China, designed for 400,000–500,000 bricks per day.

Yaxin dostarcza dostosowane rozwiązania pieca poparte wsparciem pod klucz i doświadczeniem w projektach zagranicznych.

Product Catalog & Technical Information

Download our catalog for kiln configurations, supporting equipment and project-planning reference.

Description

PROJECT OVERVIEW · CHINA

Mobile tunnel kiln for Brick Production

This documented project in Aksu, Xinjiang, China uses a mobile tunnel kiln configured for stable fired-brick production around local materials and site conditions.

12.98 mKiln width
400,000–500,000 bricksDesigned output / day
Red brickMain application

Project overview

The project photographs show the Mobile Annular Kiln brick-setting layout and production workshop used for the continuous red-brick firing process.

Engineering scope

Production routeContinuous mobile-kiln firing
Site integrationConfigured around shale, coal gangue and construction waste
Project focusLocal materials: Shale, coal gangue and construction waste
WsparcieEngineering guidance, installation and commissioning coordination
PLAN A SIMILAR PROJECT

Need a kiln configuration for your site?

Share your raw material, target capacity, fuel type and available site information with our engineering team.

Skontaktuj się z naszymi inżynierami

Ready To Launch Your Brick Making Project?

Share your raw materials, target capacity and site conditions. Our engineering team will recommend a suitable kiln configuration and implementation plan.

Contact Info:

官网询盘

View More Product Cases

Nasz globalny ślad projektu

官网询盘