{"id":658,"date":"2026-09-21T04:06:10","date_gmt":"2026-09-21T04:06:10","guid":{"rendered":"https:\/\/yaxinkilntech.com\/rwanda-4-8m-prefabricated-tunnel-kiln-project\/"},"modified":"2026-09-21T04:06:10","modified_gmt":"2026-09-21T04:06:10","slug":"rwanda-4-8m-prefabricated-tunnel-kiln-project","status":"publish","type":"post","link":"https:\/\/yaxinkilntech.com\/vi\/rwanda-4-8m-prefabricated-tunnel-kiln-project\/","title":{"rendered":"Rwanda 4.8 m Prefabricated Tunnel Kiln Project"},"content":{"rendered":"<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/yaxinkilntech.com\/wp-content\/uploads\/2026\/09\/rwanda-4-8m-prefabricated-tunnel-kiln-real.webp\" alt=\"4.8 m prefabricated twin-module tunnel kiln project in Rwanda\"><\/figure>\n<p>This 4.8 m prefabricated tunnel kiln project in Rwanda is included in Yaxin Kiln\u2019s official overseas project archive.<\/p>\n<h2>Project Overview<\/h2>\n<ul>\n<li><strong>Location:<\/strong> Rwanda<\/li>\n<li><strong>Kiln type:<\/strong> Prefabricated twin-module tunnel kiln<\/li>\n<li><strong>Single-section width:<\/strong> 4.8 m<\/li>\n<li><strong>Production capacity:<\/strong> Custom-configured for local raw materials, product specifications and operating conditions<\/li>\n<li><strong>Project record:<\/strong> Overseas project with on-site kiln photographs<\/li>\n<\/ul>\n<h2>Project Summary<\/h2>\n<p>The project uses factory-prefabricated structural components and a twin-module arrangement. This modular approach supports consistent construction quality and an efficient on-site installation sequence.<\/p>\n<p><a href=\"\/vi\/contact-us\/\">Discuss a Similar Project<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>A 4.8 m prefabricated tunnel kiln project in Rwanda using a modular twin-section kiln structure.<\/p>","protected":false},"author":1,"featured_media":653,"comment_status":"","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[33],"tags":[],"class_list":["post-658","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-rwanda"],"_links":{"self":[{"href":"https:\/\/yaxinkilntech.com\/vi\/wp-json\/wp\/v2\/posts\/658","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yaxinkilntech.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yaxinkilntech.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yaxinkilntech.com\/vi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yaxinkilntech.com\/vi\/wp-json\/wp\/v2\/comments?post=658"}],"version-history":[{"count":0,"href":"https:\/\/yaxinkilntech.com\/vi\/wp-json\/wp\/v2\/posts\/658\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/yaxinkilntech.com\/vi\/wp-json\/wp\/v2\/media\/653"}],"wp:attachment":[{"href":"https:\/\/yaxinkilntech.com\/vi\/wp-json\/wp\/v2\/media?parent=658"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yaxinkilntech.com\/vi\/wp-json\/wp\/v2\/categories?post=658"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yaxinkilntech.com\/vi\/wp-json\/wp\/v2\/tags?post=658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}