{"id":657,"date":"2026-09-21T04:06:09","date_gmt":"2026-09-21T04:06:09","guid":{"rendered":"https:\/\/yaxinkilntech.com\/kyrgyzstan-12-98m-mobile-tunnel-kiln-project\/"},"modified":"2026-09-21T04:06:09","modified_gmt":"2026-09-21T04:06:09","slug":"kyrgyzstan-12-98m-mobile-tunnel-kiln-project","status":"publish","type":"post","link":"https:\/\/yaxinkilntech.com\/es\/kyrgyzstan-12-98m-mobile-tunnel-kiln-project\/","title":{"rendered":"Kyrgyzstan 12.98 m Mobile Tunnel Kiln Project"},"content":{"rendered":"<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/yaxinkilntech.com\/wp-content\/uploads\/2026\/09\/kyrgyzstan-12-98m-mobile-tunnel-kiln-real2.webp\" alt=\"12.98 m mobile tunnel kiln project in Kyrgyzstan\"><\/figure>\n<p>This 12.98 m mobile tunnel kiln project in Kyrgyzstan is documented in Yaxin Kiln\u2019s official overseas project archive.<\/p>\n<h2>Project Overview<\/h2>\n<ul>\n<li><strong>Location:<\/strong> Kirguist\u00e1n<\/li>\n<li><strong>Kiln type:<\/strong> Mobile tunnel kiln<\/li>\n<li><strong>Cross-section:<\/strong> 12.98 m<\/li>\n<li><strong>Production capacity:<\/strong> Custom-configured for local raw materials, product specifications and operating conditions<\/li>\n<li><strong>Project record:<\/strong> Overseas project with on-site kiln photographs<\/li>\n<\/ul>\n<h2>Project Summary<\/h2>\n<p>The archived site photographs document the covered production workshop, kiln route and fired brick handling area. The kiln configuration was matched to the local raw materials and operating conditions.<\/p>\n<p><a href=\"\/es\/contact-us\/\">Discuta un proyecto similar<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>A 12.98 m mobile tunnel kiln project in Kyrgyzstan, configured to local raw materials and operating conditions.<\/p>","protected":false},"author":1,"featured_media":652,"comment_status":"","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32],"tags":[],"class_list":["post-657","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kyrgyzstan"],"_links":{"self":[{"href":"https:\/\/yaxinkilntech.com\/es\/wp-json\/wp\/v2\/posts\/657","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yaxinkilntech.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yaxinkilntech.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yaxinkilntech.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yaxinkilntech.com\/es\/wp-json\/wp\/v2\/comments?post=657"}],"version-history":[{"count":0,"href":"https:\/\/yaxinkilntech.com\/es\/wp-json\/wp\/v2\/posts\/657\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/yaxinkilntech.com\/es\/wp-json\/wp\/v2\/media\/652"}],"wp:attachment":[{"href":"https:\/\/yaxinkilntech.com\/es\/wp-json\/wp\/v2\/media?parent=657"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yaxinkilntech.com\/es\/wp-json\/wp\/v2\/categories?post=657"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yaxinkilntech.com\/es\/wp-json\/wp\/v2\/tags?post=657"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}